China Manufacturer For Hand Pump Sprayer Replacement Parts - API 7K Type WWB Manual Tongs Pipe handling tools – VS

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It really is a good way to further improve our goods and service. Our mission would be to acquire inventive items to buyers with a very good encounter for Air Pump Parts, Alfa Drill Machine, 360 Drilling Machine, On account of superior quality and competitive price , we will be the market leader, please don’t hesitate to contact us by phone or email, if you are interested in any of our products.
China Manufacturer For Hand Pump Sprayer Replacement Parts - API 7K Type WWB Manual Tongs Pipe handling tools – VS Detail:

Type Q60-273/48(2 3/8-10 3/4in)WWB Manual Tong is an essential tool in oil operation to fasten remove the screws of drill pipe and casing joint or coupling. It can be adjusted by changing latch lug jaws.

Technical Parameters

No.of Latch Lug Jaws

Size Pange Rated Torque

mm

in

KN·m

1#

60.3-95.25

2 3/8-3 3/4

48

2#

88.9-117.48

3 1/2-4 5/8

3#

114.3-146.05

4 1/2-4 5/8

4#

133,.35-184.15

5 1/2-5 3/4

5#

174.63-219.08

6 7/8-8 5/8

6#

228.6-273.05

9-10 3/4

35


Product detail pictures:

China Manufacturer For Hand Pump Sprayer Replacement Parts - API 7K Type WWB Manual Tongs Pipe handling tools – VS detail pictures


Related Product Guide:

With dependable high-quality method, fantastic standing and ideal purchaser assistance, the series of products produced by our firm are exported to many countries and regions for China Manufacturer For Hand Pump Sprayer Replacement Parts - API 7K Type WWB Manual Tongs Pipe handling tools – VS , The product will supply to all over the world, such as: Provence, US, Barcelona, "Create Values,Serving Customer!" is the aim we pursue. We sincerely hope that all customers will establish long term and mutually beneficial cooperation with us.If you wish to get more details about our company, Please contact with us now!
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Eden from Zurich - 2018.09.29 17:23
    This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Karen from Gambia - 2017.09.16 13:44
    Write your message here and send it to us

    Related products

    • PriceList For Portable Electric Drill - Mechanical Drive Drilling Rig – VS

      PriceList For Portable Electric Drill - Mechan...

      The drawworks, rotary table and mud pumps of mechanical drive drilling rig are powered by diesel engine and driven by compound way, and the rig can be used for oil-gas field development on land below 7000m well depth. Mechanical Drive Drilling Rig Basic Parameters: Type ZJ20/1350L(J) ZJ30/1700L(J) ZJ40/2250L(J) ZJ50/3150L(J) ZJ70/4500L Nominal drilling depth 1200—2000 1600—3000 2500—4000 3500—5000 4500—7000 Max. hook load KN 1350 1700 2250 3150 4500 ...

    • Factory Selling Pull Control Cable - NJ Mud Agitator (Mud Mixer) for Oil field fluid  – VS

      Factory Selling Pull Control Cable - NJ Mud Ag...

      NJ mud agitator is an important part of mud purification system. In general, each mud tank equips with 2 to 3 mud agitators installed on the circulation tank, which make impeller goes into certain depth under the liquid level by revolving shaft. The circulating drilling fluid is not easy to precipitate because of its stirring and the chemicals added can be mixed evenly and quickly. The adaptive environment temperature is -30~60℃. Main Technical Parameters : Model NJ-5.5 NJ-7.5 NJ-11...

    • Bottom Price Nov T3 - TESCO Top Drive System (TDS) Spare Parts / Accessories – VS

      Bottom Price Nov T3 - TESCO Top Drive System (...

      TESCO Top Drive Spare Parts list: 1320014 Cylinder Lock, P/H, EXI/HXI 1320015 Ring,Snap,Internal,Truarc N500-500 820256 Ring,Snap,Internal,Truarc N500-150 510239 Screw,cap Nex HD 1″-8UNCx8,5,GR8,PLD,DR,HD 0047 GAUGE Lig Filled 0-300Psi/kPa 2,5″ODx1/4″MNPT,LM 0072 TERMO 304 S/S,1/2×3/4×6.0 LAG 0070 TERMOMETR BIMETEL 0-250, 1/2″ 1320020 VALVE CATRIDGE RELIEF 400Psi,50GPM SUN RPGC-LEN 0062 GAUGE Lig Filled 0-100Psi/kPa 2,5″ODx1/4″MNPT,LM 1502 Fiting ...

    • Factory Source Dentist Drill - Truck-Mounted Rig for Oil Well Drlling – VS

      Factory Source Dentist Drill - Truck-Mounted R...

      Series of self-propelled truck-mounted rig are suitable to meet the operation requirements of drilling 1000~4000 (4 1/2″DP) oil, gas and water wells. The overall unit bears the features of reliable performance, easy operation, convenient transportation, low operation and moving expenses, etc. Rig type ZJ10/600 ZJ15/900 ZJ20/1350 ZJ30/1800 ZJ40/2250 Nominal drilling depth, m 127mm(5″) DP 500~800 700~1400 1100~1800 1500~2500 2000~3200 114mm(41/2″) DP 500~1000...

    • Factory Making 12v Water Pump - TOP DRIVE IBOP – VS

      Factory Making 12v Water Pump - TOP DRIVE IBOP...

      NOV Varco Top drive system Varco TDS TDS-3, TDS-3S, TDS-4, TDS-4S, TDS-5, TDS-7S Varco TDS TDS-8SA, TDS-9SA, TDS-10SA, TDS-11SA, TDS10SH, TDS11SH TDS Manufacture IBOP MODEL O.D. I.D. L thread API in mm in mm in mm VARCO hydraulic187 IBOP 110103-500 7-23/64 187 3-1/16 78 22-1/2 572 6-5/8 REG BOX-6-5/8 REG BOX manual 187 IBOP 14706-500 7-23/64 187 3-1/16 78 22-19/32 523 6-5/8 REG BOX-6-5/8 REG PIN 30177592 BALL/SEAT SET-LOWER IBOP, EXT STOP,ST BO(replaces 99497) 110186 CYLINDER,ACTU...

    • OEM Factory For Portable Pillar Drill - AC VF Drive Drlling Rig 1500-7000m – VS

      OEM Factory For Portable Pillar Drill - AC VF ...

      • Drawworks adopt main motor or independent motor to achieve automatic drilling and make real time monitoring for tripping operation and drilling condition. • Intelligent traveling block position control has the function of preventing “bumping top and smashing bottom”. • The drilling rig is equipped with independent driller control room. The gas, electric and hydraulic control, drilling parameters and instrument displays can be arranged unitedly so that it can achieve logic control, monitorin...