100% Original Factory Metal Brush For Drill - DC Drive Drilling Rig/ Jackup Rig 1500-7000m – VS

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are commitment to offer the competitive price ,outstanding products quality, as well as fast delivery for ECI 1350, 110 Water Pump, Air Driven Winch, Our professional technical team will be wholeheartedly at your service. We sincerely welcome you to visit our website and company and send us your inquiry.
100% Original Factory Metal Brush For Drill - DC Drive Drilling Rig/ Jackup Rig 1500-7000m – VS Detail:

The drawworks, rotary table and mud pump are driven by DC motors, and the rig can be used in deep well and ultra deep well operation onshore or offshore.
• It can be equipped with top drive device.
• It can be equipped with overall moving slide rail or stepping device to meet the requirements for movement between well locations as cluster drilling is conducted.

Type and Main Parameters of DC Drive Drilling Rig:

Type

ZJ40/2250DZ

ZJ50/3150DZ

ZJ70/4500DZ

ZJ90/6750DZ

Nominal drilling depth(114mm drill pipe)

2500—4000

3500—5000

4500—7000

6000—9000

Max. hook load, KN

2250

3150

4500

6750

Max. line number of traveling system

10

12

12

14

mm(in)

Drilling wire Dia.

32(1 1/4)

35 (1 3/8)

38(1 1/2)

45(1 3/4)

Sheave OD of traveling system

1120(44)

1270(50)

1524(60)

1524(60)

Swivel stem through-hole Dia.

75(3)

75(3)

75(3)

102(4)

Rated power of drawwork KW(hp)

735(1000)

1100(1500)

1470(2000)

2210(3000)

Drawwork shifts

4

4

4

4

Opening Dia. of rotary table

698.5(27 1/2)

698.5

(27 1/2)

952.5

(37 1/2)

952.5

(37 1/2)

952.5

(37 1/2)

1257.3

(49 1/2)

 Rotary table shifts

2

2

2

2

Single mud pump power

960(1300)

960

(1300)

1180

(1600)

1180

(1600)

1620

(2200)

Mast working height

43(142)

45(147)

45(147)

48(157)

Drill floor height

7.5(25)

7.5(25)

9(30)

9(30)

10.5

(35)

10.5

(35)

12(40)

Clear height of drill floor

6.26(20.5)

6.26

(20.5)

7.62

(25)

7.42(24.5)

8.92(29.5)

8.7

(28.5)

10(33)

Note

DZ——DC drive drilling rig


Product detail pictures:

100% Original Factory Metal Brush For Drill - DC Drive Drilling Rig/ Jackup Rig 1500-7000m – VS detail pictures


Related Product Guide:

We've got a really efficient group to deal with inquiries from prospects. Our purpose is "100% customer fulfillment by our product excellent, price & our group service" and enjoy a superb track record amid clientele. With many factories, we can easily deliver a wide selection of 100% Original Factory Metal Brush For Drill - DC Drive Drilling Rig/ Jackup Rig 1500-7000m – VS , The product will supply to all over the world, such as: Greenland, San Diego, Kazakhstan, If any item be of interest to you, please let us know. We will try our best to satisfy your requirements with high quality products, the best prices and prompt delivery. Please feel free to contact us at any time. We will reply you when we receive your inquiries. Please note that samples are available before we start our business.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Josephine from Cologne - 2017.08.28 16:02
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Belle from Guatemala - 2017.01.11 17:15
    Write your message here and send it to us

    Related products

    • Manufacturing Companies For Lug Nut Drill - Truck-Mounted Rig for Oil Well Drlling – VS

      Manufacturing Companies For Lug Nut Drill - Tr...

      Series of self-propelled truck-mounted rig are suitable to meet the operation requirements of drilling 1000~4000 (4 1/2″DP) oil, gas and water wells. The overall unit bears the features of reliable performance, easy operation, convenient transportation, low operation and moving expenses, etc. Rig type ZJ10/600 ZJ15/900 ZJ20/1350 ZJ30/1800 ZJ40/2250 Nominal drilling depth, m 127mm(5″) DP 500~800 700~1400 1100~1800 1500~2500 2000~3200 114mm(41/2″) DP 500~1000...

    • Chinese Wholesale Tts Drilling Solutions - Workover Rig for plugging back, pulling and resetting liners etc. – VS

      Chinese Wholesale Tts Drilling Solutions - Wor...

      General Description: Workover rigs made by our company are designed and manufactured in accordance with standards of API Spec Q1, 4F, 7K, 8C and relevant standards of RP500, GB3826.1, GB3826.2, GB7258, SY5202 as well as “3C” compulsory standard. Whole workover rig has a rational structure, which only occupies a small space due to its high degree of integration. Heavy load 8×6, 10×8, 12×8, 14×8 regular drive self-propelled chassis and hydraulic power steering system are ut...

    • Factory Price Allison M20 Marine Transmission - VARCO (NOV) Top Drive Spare Parts – VS

      Factory Price Allison M20 Marine Transmission -...

      VARCO (NOV) Top Drive Spare Parts list: PART NUMBER DESCRIPTION 11085 RING,HEAD,CYLINDER 31263 SEAL, POLYPAK, DEEP 49963 SPRING, LOCK 50000 PKG, STICK, INJECTION, PLASTIC 53208 SPART,FTG, GREASE STR, DRIVE 53408 PLUG, PLASTIC PIPE CLOSURE 71613 BREATHER,RESERVOIR 71847 CAM FOLLOWER 72219 SEAL,PISTON 72220 SEAL ROD 72221 WIPER, ROD 76442 GUIDE, ARM 76443 COMPRESSION SPRING 1.95 76841 TDS-3 SWITCH PRESSURE EEX 77039 SEAL,LIP 8.25×9.5x.62 77039 SEAL,LIP 8.25×9.5x.62 78916 NUT,FIXING*SC...

    • 2022 High Quality Push Pull Bowden Cable - TPEC Top Drive System (TDS) Spare Parts / Accessories – VS

      2022 High Quality Push Pull Bowden Cable - TPE...

      TPEC Top Drive Spare Parts list: PN. Name 1.07.14.001 Brake block 1.07.08.002 key 2.3.04.003 Brake (bracket) 2.4.25.011 Steel pipe u 2.4.25.025 Steel pipe (H) 2.4.25.013 Steel pipe П 2.4.34.073 Fittings, cross-over sub 2.4.34.047 Fittings, cross-over sub 2.4.34.074 Fittings, four-way sub 2.4.34.089 Pipe fitting,tee sub 1.10.05.007 pulley 1.03.15.204 Lock nut 1.08.10.005 IBOP actuator 1.08.03.013 Upper IBOP 1.08.04.008 Lower IBOP 2.4.25.028 Steel pipe 2.4.25.018 Steel pipe c 2.4.25.027 Steel p...

    • 18 Years Factory Floor Standing Drill Press - AC VF Drive Drlling Rig 1500-7000m – VS

      18 Years Factory Floor Standing Drill Press - ...

      • Drawworks adopt main motor or independent motor to achieve automatic drilling and make real time monitoring for tripping operation and drilling condition. • Intelligent traveling block position control has the function of preventing “bumping top and smashing bottom”. • The drilling rig is equipped with independent driller control room. The gas, electric and hydraulic control, drilling parameters and instrument displays can be arranged unitedly so that it can achieve logic control, monitorin...

    • Chinese Professional Pneumatic Hammer Drill - Truck-Mounted Rig for Oil Well Drlling – VS

      Chinese Professional Pneumatic Hammer Drill - ...

      Series of self-propelled truck-mounted rig are suitable to meet the operation requirements of drilling 1000~4000 (4 1/2″DP) oil, gas and water wells. The overall unit bears the features of reliable performance, easy operation, convenient transportation, low operation and moving expenses, etc. Rig type ZJ10/600 ZJ15/900 ZJ20/1350 ZJ30/1800 ZJ40/2250 Nominal drilling depth, m 127mm(5″) DP 500~800 700~1400 1100~1800 1500~2500 2000~3200 114mm(41/2″) DP 500~1000...